Installation

A system that fits the lot, passes DEHQ, and is set to grade. We handle design coordination, permits, and the install—not just the excavation.

Why professional installation matters

California does not treat a new or replacement OWTS as a weekend project. The county must approve the layout. The tank must be IAPMO-approved. The drainfield must match soil, slope, setbacks, and design flow.

A tank set wrong, a field in bad soil, or a skipped inspection becomes a failed system you cannot easily undo.

Solid State Septic installs residential and small commercial systems across San Diego County as a licensed C-42 contractor and DEHQ-approved OWTS installer.

Build it once. Build it to the permit.

What installation includes

When you need a new or replacement system

Tank Talk: News from the Field

Protect the drainfield. Pump the tank on schedule.

Yes. New systems and replacements require a DEHQ installation permit. We prepare and submit the package.

Yes, when the site can support an approved design. Slopes over 25 percent, shallow soil, or high groundwater often need an engineered or supplemental treatment system instead of a standard gravity field.

Yes, for small commercial properties within typical OWTS flow limits, subject to site and county review.

The field work is often days, not months. Permitting and any required percolation or engineering time are what stretch the calendar. Start that step early.